Data center investments are among the largest capital projects in the country, generating thousands of construction jobs, significant ongoing employment, and substantial tax revenue for host communities. Whether you are a hyperscale operator seeking zoning approval, a developer applying for tax incentives, or a local government evaluating a proposed project, an economic impact study provides the credible, independent data that decision-makers need.

We work with operators, developers, utilities, and government agencies on site-specific and portfolio-level studies. Our analysis covers both the construction phase and long-term operations, with detailed breakdowns by tax type and government jurisdiction, built to support public hearings, incentive applications, and stakeholder communication.

Request a proposal
Data center server room with rows of equipment

Results we report

Construction impact

Jobs, wages, and output from site preparation, building construction, and equipment installation.

Operational impact

Ongoing employment, utility purchases, maintenance, and supply chain spending during facility operations.

Tax revenue

Property, sales, income and other taxes, reported by level of government.

Induced effects

Household spending by construction workers and operations employees rippling through the local economy.

Supply chain analysis

Upstream spending on electrical equipment, cooling systems, fiber, and professional services.

Community investment

Workforce training programs, infrastructure improvements, and community benefit commitments.

Our method for data center studies

We model construction and operations as separate phases and never add them into a single annual figure. Construction is a one-time shock spread over the build schedule. Operations recur every year once the facility is running.

For construction, we split the capital budget into site work and shell, mechanical and electrical systems, IT equipment, and professional services, because each category has a different local share. Most servers, switchgear, generators and chillers are manufactured outside the host county. In the regional model we enter only the local portion of those purchases, such as installation labor, freight and distributor margins. Entering the full equipment budget as local spending is a frequent cause of overstated data center results.

For operations, the direct shock is on-site payroll plus local purchases of maintenance, security and other services. Electricity needs care: its local effect depends on where the power is generated and how the utility is structured.

Fiscal results are reported by tax type and jurisdiction, net of any abatements in the incentive agreement, and kept in tables separate from the economic results.

Typical inputs we ask for

  • Capital budget by category (site and shell, MEP, IT equipment, soft costs)
  • Construction schedule and expected peak on-site workforce
  • Planned operating headcount and wage levels
  • Annual operating budget excluding depreciation
  • Expected power demand and the serving utility
  • Parcel and assessed-value details, plus the terms of any incentive or abatement

Questions clients ask

Why are operations jobs so much smaller than construction jobs?

Data centers are capital intensive. The building and equipment cost a great deal relative to the staff needed to run them, so construction usually supports far more jobs than operations. Construction jobs last for the build; operations jobs recur every year. We report both, label construction as one-time, and show the supply-chain and household-spending effects of operations so the recurring footprint is visible.

Can the study support a tax incentive application?

Yes. Our project studies for Cielo Digital Infrastructure supported incentive applications and local government negotiations, with fiscal results by tax type modeled net of abatements. If a jurisdiction needs to weigh new revenue against the cost of public services, that is a fiscal impact question, and we scope a fiscal module alongside the economic impact study.

Should the study area be the county or the state?

It depends on who will read the results. A county planning commission or board of supervisors needs county figures, which will show more leakage because less equipment and fewer services are sourced locally. A state incentive program may want statewide results, which capture more of the supply chain. We can report both levels, labeled clearly, so neither figure is quoted in the wrong setting.

Related reading

Sources

  • Bess and Ambargis, Input-Output Models for Impact Analysis: Suggestions for Practitioners Using RIMS II Multipliers, BEA working paper WP2012-3 (on producer prices, margins and entering only net local final demand) Source

U.S. Data Center Construction

Data center facility interior Data Centers

U.S. Data Center Construction

National industry report quantifying the economic footprint of data center construction across the United States.

571K+ Jobs $155.8B in sales

Credentials and terms

IMPLAN certified
Two of the 42 economists in IMPLAN’s certified directory.
Independent
We have no financial interest in the results we report.
Designed reports
Designed reports ready for boards, legislators, and press.
48-hour proposals
Detailed scope, timeline, and fixed-fee quote.

Get a proposal within 48 hours

Tell us about your project and we will send a scope, timeline and fixed fee.